🔮 Pandora's Projects

Kanban Board • Updated Feb 3, 2026

📋

Backlog

5

GSC Alert Diagnosis

Enhance daily reports to explain WHY alerts fired - position changes, trends, causes

SEO

Semantic Checker → n8n

Add content checker as pre-flight step in blog generation workflows

Tool

PageSpeed Auto-Fixer

Auto-detect & fix common PageSpeed issues (images, render-blocking, etc.)

Infra

TPP CTR Optimization

Meta titles & descriptions overhaul for better click-through rates

Client

Weekly Client Reports

Automated weekly SEO performance reports via n8n to all clients

SEO
🔄

In Progress

3

Notion Page Database Sync

Sync extracted page data to Notion for visual querying

Tool
Started Feb 2

GSC Alert Analysis

5 clients flagged (IAT, SADC, Whitewash, Rosella, TPP) - investigating traffic dips

SEO
Feb 2

Detail Dynasty Phase 2-3

Image optimization, gallery section, design polish for DD website

Client
Started Feb 1
✅

Done

11

Semantic Content Checker v2

Qdrant-powered semantic search to detect content overlap

Tool
Feb 2

Page Database System

GSC page extraction + keyword tracking for all clients (1,158 pages)

Tool
Feb 2

qdrant-search CLI

Command-line tool for searching Qdrant vector collections

Tool
Feb 2

n8n Auto-Recovery

Auto-retry failed jobs + Telegram escalation after 3 failures

Infra
Feb 2

GSC/GA4 Daily Reports

Automated daily performance reports to Discord #seobot

SEO
Feb 1

Detail Dynasty Foundation

30-page Next.js website with full SEO structure

Client
Feb 1

Alert Throttling System

Intelligent alert batching to prevent notification spam

SEO
Feb 1

Cannibalization Detection

Automated keyword cannibalization scanning across clients

SEO
Feb 1

Health Score Dashboard

Client SEO health scoring with trend tracking

SEO
Feb 1

Google Drive Access

rclone + gog CLI OAuth configured for cloud storage

Infra
Jan 28

Qdrant Integration

Vector DB connected with 24 collections + API access

Infra
Feb 2